Project Updates: March, 2012

7 March, 2012

AREA UPDATE
LITTLE WATER STREET INFRASTRUCTURE ENABLING WORKS

Ongoing Work

  • Base slab construction of inlet structure
  • Pouring of base slabs and installation of precast box culverts to excavation area (Triple and Single Run of culverts)
  • Construction of chambers
Upcoming Work
  • Laying of new sewer pipes
Completed Work
  • Several single cell culverts

7 March

Site East

March 7 (2)

Inlet Structure - Base Slab Preparation

9 March, 2012

AREA UPDATE
ROYAL INTERNATIONAL CONVENTION CENTRE

New Work

  • Concrete pour continues for level 1 suspended slabs
  • Substation block work

Ongoing Work

  • Column and footings' concrete pour
  • Form work in preparation for further level 1 concrete pours
Upcoming Work
  • Concrete pour of further suspended slabs.
  • Fabrication and installation of structural steel
  • Installation of structural steel for substation and roof

9 March 1

Foyer Area

9 March 2

Pour Area for Deck

17 March, 2012

AREA UPDATE
ROYAL INTERNATIONAL CONVENTION CENTRE

New Work

  • Concrete pour of areas 11 and 12
  • Substation block work

Ongoing Work

  • Column and footings' concrete pour
  • Form work for level 1 in preparation for concrete pour
  • Stripping formwork
  • Laying of further concrete slabs

Upcoming Work

  • Concrete pour of further suspended slabs.
  • Fabrication and installation of structural steel
  • Installation of structural steel for substation and roof

17 March 1

Lower Car Park

17 March 2

Ramps to Lower Carpark

23 March, 2012

AREA UPDATE
ROYAL INTERNATIONAL CONVENTION CENTRE

New Work

  • Concrete pour for level 1 suspended decks
  • Installation of structural steel for substation

Ongoing Work

  • Columns and footings' concrete pour
  • Installation of reinforcement for level 1 pour
  • Stripping formwork
  • Laying of further concrete slabs

Upcoming Work

  • Laying of further concrete slabs and installation of structural steel
  • Concrete pour of level 1 deck
  • Installation of structural steel for substation and roof

23 March

Pour Area for Deck

28 March, 2012

AREA UPDATE
LITTLE WATER STREET INFRASTRUCTURE ENABLING WORKS

New Work

  • Final delivery of culverts for installation

Ongoing Work

  • Single cell culverts progressing towards inlet on Costin Street
  • Construction of stormwater chambers
  • Backfill for single cell culvert line towards St Paul's Terrace

28 March 1

28 March 2

29 March, 2012

AREA UPDATE
ROYAL INTERNATIONAL CONVENTION CENTRE

New Work

  • Concrete pour of further level 1 suspended decks
  • Substation roof installation

Ongoing Work

  • Columns and footings' concrete pour
  • Installing top reinforcement to level 1
  • Stripping formwork
  • Laying of further concrete slabs

Upcoming Work

  • Laying of further concrete slabs and installation of structural steel
  • Concrete pour of level 1 deck
29 March 1 29 March 2