Project Updates: November, 2011

4 November, 2011

AREA UPDATE
INDUSTRIAL PAVILION

New Work

  • Infrastructure installation for first suspended slab

Ongoing Work

  • Bulk and detail excavation, concrete pour for columns and footings

Upcoming Work

  • Concrete pour to continue for columns and footings while awaiting the first suspended slab to be laid
LITTLE WATER STREET INFRASTRUCTURE ENABLING WORKS

Ongoing Work

  • Removal of Agriculture Hall and Dog Pavilion
Upcoming Work

  • Preliminary soil works for stormwater and sewer lines
  • Construction of stormwater intake structure
Image 1
Gregory Terrace and Ekka Plaza facade
image 2
Site Works
Removal of Agricultural Hall
Removal of Agricultural Hall
Removal of Dog Pavilion
Removal of Dog Pavilion
image 3
Panoramic

11 November, 2011

AREA UPDATE
LITTLE WATER STREET INFRASTRUCTURE ENABLING WORKS

New Work

  • Preliminary soil works for stormwater and sewer lines

Ongoing Work

  • Removal of Dog Pavilion
Upcoming Work

  • Site preparation and foundation piling for stormwater inlet structure
11.11.11 (1) 11.11.11 (2)

18 November, 2011

AREA UPDATE
LITTLE WATER STREET INFRASTRUCTURE ENABLING WORKS

New Work

  • Compaction ground works for machinery
  • Foundation piling for stormwater infrastructure

Ongoing Work

  • Removal of Dog Pavilion
Upcoming Work
  • Piling for further stormwater infrastructure
  • St Pauls Terrace stormwater connection works
  • Alexandria Street stormwater works
  • Foundation piling around stormwater inlet structure
  • Culvert works to commence
  • Erection of hoarding to Jubilee Hotel boundary
18.11.11 (1)
18.11.11 (2)

 

 

23 November, 2011

AREA UPDATE
INDUSTRIAL PAVILION

Ongoing Work

  • Bulk and detailed excavation, pouring columns and footings and laying in-ground services

Upcoming Work

  • Further suspended concrete slabs to be laid
LITTLE WATER STREET INFRASTRUCTURE ENABLING WORKS

New Work

  • Manhole construction works
  • Erection of 200 tonne crawler crane

Ongoing Work

  • Construction of manhole in St Pauls Terrace
  • Erection of hoarding to Jubilee Hotel boundary
  • Ongoing culvert works
  • Alexandria Street stormwater works
  • Foundation piling around stormwater inlet structure
Upcoming Work
  • Removal of gatehouse on St Pauls Terrace
IP 1 IP 2
IP 3
LWS 1 LWS 4
LWS 3 LWS 2
Preliminary soil works for stormwater and sewer lines