Project Update: April

30 APRIL 2011

Trench Excavationv2
Trench excavation for high voltage feed into the site along Short Street
Footing Support For Temporary Structural Steel To Gregory Terrace Facadev2
Footing support for temporary structural steel to Gregory Terrace Facade
Demolition Of Building 6
Demolition of Building 6 to make way for major infrastructure works for the regeneration

25 April 2011

This is a sample looooooooooooooooooooooong title
This is a sample looooooooooooooooooooooong title
Demolition Of Building 6
This is a test decription that describe the conten

13 APRIL 2011

New Work
Industrial Pavilion
Footing Support For Temporary Structural Steel To Gregory Terrace Facadev2
Footing support for temporary structural steel to Gregory Terrace Facade
Masterplan Infrastructure
Demolition Of Building 6
Demolition of Building 6 to make way for major infrastructure works for the regeneration
Trench Excavationv2
Trench excavation for high voltage feed into the site along Short Street

02 April 2011

Test
Demolition Of Building 6

01 APRIL 2011

April fools
This is sample loooooooooooooooooooooooong title 1
Demolition Of Building 6
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa. Cum sociis natoque penatibus et magnis dis parturient montes, nascetur ridiculus mus. Donec quam felis, ultricies nec, pellentesque eu, pretium quis, sem. Nulla consequat massa quis enim. Donec pede justo, fringilla vel, aliquet nec, vulputate eget, arcu. In enim justo, rhoncus ut, imperdiet a, venenatis vitae, justo. Nullam dictum felis eu pede mollis pretium. Integer tincidunt. Cras dapibus.
Trench Excavationv2
Footing Support For Temporary Structural Steel To Gregory Terrace Facadev2